
Nadezhda, Russia
Waste heat boiler equipment to Nadezhda, Russia included tailored chain conveyor and airlock feeder.
Waste heat boiler equipment to Nadezhda, Russia included tailored chain conveyor and airlock feeder.
ESP lime dust conveying system was delivered to Kymi, Finland to meet the increased capacity. After the upgrade, mill’s yearly production capacity increased to 870 000 tons of bleached pulp.
ESP equipment and scraper conveyors were provided to one of the world’s largest mills in OKI, Indonesia for air quality control.
Laitex carried out a life cycle inspection of Stora Enso’s Kaukopää mills, which resulted modernization of soda ash conveyors to meet increased capacity, the safety plan and to improve the reliability of the production process.
Wood chip storage modifications was provided to Arkhangelsk, Russia to enhance efficiency in wood processing. Plant’s equipment was modernized by remodeling existing three wood chip silos.
Green Fuel Nordic Oy’s bio-oil refinery plant uses 100% renewable forest-based raw materials in its production. Laitex’s supplied the plant with material handling system.
Laitex supplied material handling system for the white liquor plant. The white liquor plant was constructed with Laitex to meet the highest environmental standards.
A Laitex customer upgrades its oil shale preparation plant in Ida-Virumaa, Estonia. Laitex delivers technology and provides process automation for the plant’s oil shale preparation expansion.
Two bark boilers (BB4 & BB5) in Ust-Ilimsk were modernized with new fuel feeding, ash handling and sand recirculation systems to enhance green energy production.
Coal to biomass conversion made Guadeloupe’s Le Moule power plant a user of 100 % locally produced biomass. The power plant has reduced its CO2 emissions by 87 %.