Eurasia, Confidential client
Two bark boilers (BB4 & BB5) were modernized with new fuel feeding, ash handling and sand recirculation systems to enhance green energy production.
Two bark boilers (BB4 & BB5) were modernized with new fuel feeding, ash handling and sand recirculation systems to enhance green energy production.
Coal to biomass conversion made Guadeloupe’s Le Moule power plant a user of 100 % locally produced biomass. The power plant has reduced its CO2 emissions by 87 %.
Laitex designed and supplied a fuel feeding system and ash handling equipment for the 45 MWth Bubbling Fluidized Bed (BFB) boiler.
Fuel handling system for a steam plant was delivered as a turnkey solution to Turku, Finland.
Fuel handling system for Haapajärven Lämpö was delivered with biomass handling equipment in 2021. The power plant invested in a new 20 MWth fluidized bed boiler plant that uses wood chips, sawmill by-products and untreated recycled wood as fuel.